Monday

Quarter 4, Weeks 10 and 11

Journal Check #11 (final journal check)
  • Should be at least 10 entries starting from the end of the last journal check.  You all have slightly different dates and amounts; however, 10 is a GENEROUSLY LOW number.  
  • Complete your yellow checklist and have someone verify for you in the last column. ONLY THE SCORE COLUMN SHOULD BE EMPTY.
  • This needs to be done and left in my room by 3:00 on Friday, May 29.
Hall Pass Bonus (Periods 1, 2, 3, & 7 ONLY)
  • Orange Hall passes, used-up or not, must be placed on the inside front cover of your journal to receive credit.  Even if you used-up all six passes, simply turning it in will still earn you an enrichment credit.

  • Any revisions to these documents need to be completed by midnight on Friday, May 29.  If not, the grade for each will remain as-is.
  • Note: Groups receive a L/H/R score for the Lesson Plan, and a complete/incomplete score for the Annotated Bibliography.
Multimedia Lesson Reflection
  • EACH PERSON must complete THEIR OWN reflection.  All groups must follow the template provided, print or hand-write, and turn-in by 3:00 on Friday, May 29.
  • Exception: Groups presenting on May 29 may choose to turn-in on Monday, June 1 by 3:00.

End of Year Survey
  • Each student should complete the End of Year Survey by the start of classes on Monday, June 1.
  • Note: at the end of the survey, check the box to 'send a copy of the results' to yourself.  These responses could be helpful during Socratic Seminar on Monday, June 1 or Tuesday, June 2.

  • The last round of Socratic Seminar on Monday/Tuesday will focus on Senior Project preparations that can be done over the summer.  You will receive a hard-copy in class, or you may click here to make a copy in your Google Drive or print.
  • If you are not present for the work in class, you will not be penalized. Please understand, though, that you NEED TO SERIOUSLY BEGIN CONSIDERING A PROJECT BEFORE THE YEAR BEGINS. This activity in class is meant to help you get the ball rolling over the summer.
  • FYI: Be careful about HOW MUCH you do over the summer, as you DO NOT know until the start of the year whether or not your project will be approved.